Calculation of Loom Production
What is Loom:
Problem-1:
Production of loom:
PPM = 200, PPI = 50
Production per loom per minute =200/50 =4”
Production per loom per month = 4 x 60 x 24 x 30 inch
Production per loom per year at 70% efficiency = 4 x 60 x 24 x 30 x 12 x 0.7 inch
= (4 x 60 x 24 x 30 x 12 x 0.7) / 36 yds
= (4 x 60 x 24 x 30 x 12 x 0.7) / 39.37 m
= 36868.68 m (ANS)
Problem-2:
PPM = 350
PPI = 60
No. of loom = 45
Time = 7 days
Efficiency = 90%
Find out production in m?
Solution:
350 90 1
Production = …….. x (60 x 24 x 7) x 45 x …….. x ……….. m
60 100 39.37
14288400000
= ……………….. m
236220
= 60487.68 m (ANS)
Problem-3:
PPM = 650
PPI = 58
No. of loom = 10
Time = 35 days
Production = 110000 m
Efficiency = ?
Solution:
650 x 60 x 24 x 35 x 10 x η
Production = …………………………………..
58 x 100 x 39.37
110000 x 58 x 100 x 39.37
=> η = ………………………………..
650 x 60 x 24 x 35 x 10
=> η = 76.77% (ANS)
Problem-4:
Find out Wt. of yarn in fabric (warp & weft), from the following specification.
Warp count x Weft count
.………………………...... x Fabric width
EPI x PPI
or,
20 x 22
.………… x 56”
60 x 58
Solution:
In 5000m fabric, wt of weft warp,
60 x 56 x 5000 x 1.05
= ……………………………………… kg
0.914 x 840 x 20 x 2.2046
= 521.09 kg (ANS)
In 5000m fabric, wt of weft,
58 x 39.37 x 5000 x 56 x 1.05
= ……………………………………… Kg
36 x 840 x 22 x 2.2046
= 457.73 kg (ANS)
Problem-5:
Find out the wt. of required warp & weft to produce 5000m fabric from the following specification.
18 x 16
.………….. x 58”
66 x 62
Solution:
Loom is an apparatus/device for making fabric by weaving yarn or thread. It produces fabric by interlacing a series of length wise, parallel yarns width a series of width wise parallel yarns. To get optimum output of loom we must know about the loom production calculation. In this article I have given many examples on loom production calculation.
Production Calculation of Loom:
![]() |
| Loom |
Problem-1:
Production of loom:
PPM = 200, PPI = 50
Production per loom per minute =200/50 =4”
Production per loom per month = 4 x 60 x 24 x 30 inch
Production per loom per year at 70% efficiency = 4 x 60 x 24 x 30 x 12 x 0.7 inch
= (4 x 60 x 24 x 30 x 12 x 0.7) / 36 yds
= (4 x 60 x 24 x 30 x 12 x 0.7) / 39.37 m
= 36868.68 m (ANS)
Problem-2:
PPM = 350
PPI = 60
No. of loom = 45
Time = 7 days
Efficiency = 90%
Find out production in m?
Solution:
350 90 1
Production = …….. x (60 x 24 x 7) x 45 x …….. x ……….. m
60 100 39.37
14288400000
= ……………….. m
236220
= 60487.68 m (ANS)
Problem-3:
PPM = 650
PPI = 58
No. of loom = 10
Time = 35 days
Production = 110000 m
Efficiency = ?
Solution:
650 x 60 x 24 x 35 x 10 x η
Production = …………………………………..
58 x 100 x 39.37
110000 x 58 x 100 x 39.37
=> η = ………………………………..
650 x 60 x 24 x 35 x 10
=> η = 76.77% (ANS)
Problem-4:
Find out Wt. of yarn in fabric (warp & weft), from the following specification.
Warp count x Weft count
.………………………...... x Fabric width
EPI x PPI
or,
20 x 22
.………… x 56”
60 x 58
Solution:
In 5000m fabric, wt of weft warp,
60 x 56 x 5000 x 1.05
= ……………………………………… kg
0.914 x 840 x 20 x 2.2046
= 521.09 kg (ANS)
In 5000m fabric, wt of weft,
58 x 39.37 x 5000 x 56 x 1.05
= ……………………………………… Kg
36 x 840 x 22 x 2.2046
= 457.73 kg (ANS)
Problem-5:
Find out the wt. of required warp & weft to produce 5000m fabric from the following specification.
18 x 16
.………….. x 58”
66 x 62
Solution:
66 x 58 x 5000 x 1.05 x 1.1
Required warp = ………………………..……... = 725.28 kg (ANS)
0.9144 x 840 x 18 x 2.0246
62 x 39.37 x 5000 x 58 x 1.05 x 1.1
Required weft = ………………………...................….. = 766.49 kg (ANS)
36 x 840 x 16 x 2.2046
Problem-6:
Calculate the yarn consumption of a loom per hour running at 180 PPM for producing from the following specification.
40 x 60
…………. x 56” fabric
72 x 48
Required warp = ………………………..……... = 725.28 kg (ANS)
0.9144 x 840 x 18 x 2.0246
62 x 39.37 x 5000 x 58 x 1.05 x 1.1
Required weft = ………………………...................….. = 766.49 kg (ANS)
36 x 840 x 16 x 2.2046
Problem-6:
Calculate the yarn consumption of a loom per hour running at 180 PPM for producing from the following specification.
40 x 60
…………. x 56” fabric
72 x 48
Solution:
180 1
Production/hour/loom = ……. X 60 x ……
48 36
= 6.25 yd
72 x 56 x 6.25 x 1.05 x 1.1
Req. amount of warp = …………………………………
840 x 40 x 2.004
= 0.393 Kg
48 x 36 x 6.25 x 56 x 1.05 x 1.1
Req. amount of weft = ……………………………………
36 x 840 x 60 x 2.024
= 0.175 Kg (ANS)
Problem-7:
Calculate the time required to complete a weavers beam having 1000yds of warp on it. The woven cloth is required to have 60 PPI. Loom speed is 200 and efficiency 80%. Assume any missing data.
Solution:
210 60
Production/loom/hour = ……. x ….. x 0.8
60 36
= 4.67yds
Length of cloth from the beam
Time req. = …………………………………
Actual production/hr
Length of cloth from the beam,
100 – crimp
= (Length in yds of warp x …………….) – Waste in yards
100
100 – 6
= (1000 x …………) – 6
100
= 934 yds
934
So, Time required = ……….
4.67
= 200hr (ANS)
Problem-8:
Calculate the actual yarn consumption per month of weaving mil having 100 looms of 250 ppm for the following fabric construction. Considering each point.
80 x 60
…………. X 56”
110 x 54
Production per month of 100 looms at 100% efficiency,
250 100
= …….. x (60 x 24 x 30) x …….
54 36
= 555556 yds
110 x 56 x 555556 x 1.05 x 1.1
Required amount of warp = …………………………………
840 x 80 x 2.204
= 26687 Kg
54 x 36 x 555556 x 56 x 1.05 x 1.1
Required amount of weft = …………….....……………...……..
36 x 840 x 60 x 2.204
= 17468 Kg (ANS)
Problem-9:
Find out thrust in Newton to drive a loom by using plate clutch system and conical clutch system. If F=425N, μ=0.45 and θ=20°
Solution:
F 425
For plate clutch, P = …….. = ………. = 944.44 Newton
µ 0.45
F sin θ 425 sin 200
For conical clutch system, P = ………. = …………… = 323.02 Newton (ANS)
µ 0.45
Problem-10:
Calculate the production per shift of 10 hrs at 90% efficiency a weaving mill in average 22 picks per cm from the following information:
No. of looms .........picks/cm .........PPM
120 ........................20 ...................220
16 ..........................25 ....................210
110 ....................... 28 ................... 200
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x …….. x 120 x ……. M
20 100 100
= 6480 m
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x ….. x 16 x …….
20 100 100
= 824.73 m
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x ….. x 110 x …….
20 100 100
= 5400 m
Average production = (6480 + 824.734+5400) m
= 12704.73 m (ANS)
Problem-11:
Calculate the “speed space” required to produce a elastic fabric having 30% shrinkage (width of finished fabric 50″)
130
Required reed space = 11 x 50 x ……
100
= 65 inch (ANS)
180 1
Production/hour/loom = ……. X 60 x ……
48 36
= 6.25 yd
72 x 56 x 6.25 x 1.05 x 1.1
Req. amount of warp = …………………………………
840 x 40 x 2.004
= 0.393 Kg
48 x 36 x 6.25 x 56 x 1.05 x 1.1
Req. amount of weft = ……………………………………
36 x 840 x 60 x 2.024
= 0.175 Kg (ANS)
Problem-7:
Calculate the time required to complete a weavers beam having 1000yds of warp on it. The woven cloth is required to have 60 PPI. Loom speed is 200 and efficiency 80%. Assume any missing data.
Solution:
210 60
Production/loom/hour = ……. x ….. x 0.8
60 36
= 4.67yds
Length of cloth from the beam
Time req. = …………………………………
Actual production/hr
Length of cloth from the beam,
100 – crimp
= (Length in yds of warp x …………….) – Waste in yards
100
100 – 6
= (1000 x …………) – 6
100
= 934 yds
934
So, Time required = ……….
4.67
= 200hr (ANS)
Problem-8:
Calculate the actual yarn consumption per month of weaving mil having 100 looms of 250 ppm for the following fabric construction. Considering each point.
80 x 60
…………. X 56”
110 x 54
Production per month of 100 looms at 100% efficiency,
250 100
= …….. x (60 x 24 x 30) x …….
54 36
= 555556 yds
110 x 56 x 555556 x 1.05 x 1.1
Required amount of warp = …………………………………
840 x 80 x 2.204
= 26687 Kg
54 x 36 x 555556 x 56 x 1.05 x 1.1
Required amount of weft = …………….....……………...……..
36 x 840 x 60 x 2.204
= 17468 Kg (ANS)
Problem-9:
Find out thrust in Newton to drive a loom by using plate clutch system and conical clutch system. If F=425N, μ=0.45 and θ=20°
Solution:
F 425
For plate clutch, P = …….. = ………. = 944.44 Newton
µ 0.45
F sin θ 425 sin 200
For conical clutch system, P = ………. = …………… = 323.02 Newton (ANS)
µ 0.45
Problem-10:
Calculate the production per shift of 10 hrs at 90% efficiency a weaving mill in average 22 picks per cm from the following information:
No. of looms .........picks/cm .........PPM
120 ........................20 ...................220
16 ..........................25 ....................210
110 ....................... 28 ................... 200
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x …….. x 120 x ……. M
20 100 100
= 6480 m
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x ….. x 16 x …….
20 100 100
= 824.73 m
220 90 1
Production at 22 picks/cm = …… x (60 x 10) x ….. x 110 x …….
20 100 100
= 5400 m
Average production = (6480 + 824.734+5400) m
= 12704.73 m (ANS)
Problem-11:
Calculate the “speed space” required to produce a elastic fabric having 30% shrinkage (width of finished fabric 50″)
130
Required reed space = 11 x 50 x ……
100
= 65 inch (ANS)